Major Renewable Projects
By 2030 the Outer Hebrides is set to have a new 1.8GW subsea interconnector, High Voltage Direct Current (HVDC) converter station and 400kV AC substation, located near Stornoway.
A pipeline of renewable projects at varying stages of consent and development are lined up to utilise the 1.8GW capacity.
Details of each of these projects can be found below.